MXMAXXINFRA
Contact Us
Industrial steel infrastructure
Engineering-Driven. Integrated. Accountable.

Forging the
Future of
Steel Systems.

Maxxinfra is India's integrated EPC partner for structural steel — delivering 6,000+ MT of steel structures with a single proven team. Design to commissioning.

Scroll
6,000+MT

Steel Structures Delivered

Across all project phases with Tier-1 industrial partners

0–7Days

Mobilization Readiness

Site readiness from project kick-off to production start

48–72Hrs

Design Cycle Time

Detailing & drawing turnaround from input to issue

The Maxxinfra Difference

One Partner.
Zero Gaps.

The traditional multi-vendor model fragments accountability. Maxxinfra is built as one integrated team that owns the entire steel structure delivery chain.

warningThe Industry Problem
  • closeMultiple vendors → multiple accountability gaps
  • closeDesign agency disconnected from fabricator
  • closeFabricator unaware of erection sequence
  • closeNo single owner for cost or schedule
verifiedThe Maxxinfra Solution

Design → Detailing → Fabrication → Erection → Commissioning

All under one roof. One team. One contract. One point of contact — from kick-off to handover.

trending_up6,000+ MT delivered. Same team. Zero handover risk.
bolt

Faster Execution

Integrated in-house teams eliminate inter-vendor lag. Design, fab, and erection move in parallel.

hub

Single Accountability

One partner owns the schedule, quality, and cost from concept to commissioning. No blame-shifting.

factory

Scalable Capacity

Multi-location fabrication enables rapid scale — from 500 MT to 6,000+ MT per project.

price_change

Cost Transparency

MT-based billing and ERP-tracked output. No cost surprises at project close.

groups

Proven Core Team

Same engineering, detailing, and erection crew across projects. Zero learning curve.

Partnership Flexibility

4 Ways to Engage Us

Whether you need just engineering bandwidth or a full EPC partner — we fit into your project at any stage.

01
Model 01Engineering-as-a-Service

Design & Detailing Service

architecture

Standalone 3D modelling, structural detailing, GA drawings, and BOM preparation. 48–72h standard drawing turnaround.

3D Structural ModellingGA & Shop DrawingsBOM & Material Takeoff48–72h Turnaround
02
Model 02Transparent MT-Based Billing

Fabrication per MT

precision_manufacturing

Client-supplied or Maxxinfra-procured drawings. Fabrication at Butibori or Konsari. Fully transparent per-MT pricing.

All Steel GradesIS/ASTM ComplianceThird-Party QA AvailableERP-Tracked Output
03
Model 03Design → Erection → Commissioning

Full EPC Contract

construction

End-to-end steel structure under a single contract. One team, one schedule, zero vendor gaps.

Single ContractIntegrated ScheduleSite Management IncludedCommissioning Support
04
Model 04Operate & Deliver Model

Workshop Setup & Management

warehouse

Maxxinfra establishes and operates a fabrication workshop at a client greenfield site. Full team, QA systems, 0–7 day mobilization.

Greenfield SetupFull Team DeploymentQA System Integration0–7 Day Mobilization

Not sure which model fits your project?

Our engineering team will recommend the right engagement structure within 24 hours.

Discuss Your Project