MXMAXXINFRA
Contact Us
Home/Infrastructure

Our Infrastructure

A lean, multi-location fabrication network — anchored at Butibori, Nagpur and scalable to any client greenfield site via our Operate & Deliver model.

Plant Capabilities

Industrial-Grade
Fabrication Equipment

Maxxinfra's Butibori facility is outfitted with state-of-the-art CNC fabrication, automated welding, and in-house quality assurance for structural steel production.

CNC Plasma Cutting

±0.5mm tolerance on structural profiles

SAW Welding Lines

4 automated submerged-arc welding bays

Shot Blasting

Sa 2.5 surface finish standard

Paint Booths

Epoxy + polyurethane coating systems

Overhead Cranes

20T & 50T capacity workshop cranes

QA Lab

In-house UT, RT, MPI testing capabilities

Fabrication Strategy

Two-Base Production Model

We operate from established hubs and deploy greenfield setups at client sites — enabling both high-volume throughput and project-specific responsiveness.

Operational

Butibori, Nagpur

Leased Production Base

factory
~1,000 MT / month (PEB)

Our primary leased fabrication base at Butibori Industrial Area, Nagpur — one of Central India's largest MIDC zones. Equipped for full PEB fabrication including primary members, secondary framing, and surface treatment.

LocationMIDC Butibori, Nagpur, Maharashtra
Capacity~1,000 MT / month (PEB)
ScopeHot-rolled sections, PEB primary members, purlins, girts
QualityIS 800, IS 2062 compliant fabrication
Project-Activated

Konsari

Greenfield Facility Setup

domain_add
Scalable per project

At client-designated greenfield sites, Maxxinfra deploys the Operate & Deliver model — establishing a fully functional fabrication workshop from scratch with QA systems, skilled workforce, and production management.

ModelOperate & Deliver (Client Site Activation)
Setup Time0–7 days mobilization to production-ready
TeamFull crew: detailers, fabricators, QC inspectors, supervisors
FlexibilityScalable capacity per project milestone demands
settings_suggest

The Operate & Deliver Model

When a project demands on-site fabrication capacity, Maxxinfra deploys a complete production unit to your site — workshop layout, equipment, certified workforce, QA protocols, and production management — all operational within 0–7 days of mobilization. The facility runs under Maxxinfra management until project completion, then hands over cleanly.