Same Proven Team — Only the Platform Has Evolved
Our core engineering, detailing, fabrication, and erection team has grown with every project. No fresh learning curve — a team that's done it before and knows how to do it faster.
Industrial Steel Projects Portfolio
PEB complexes, curved-roof storage sheds, crane-duty workshops, a helicopter hangar and hospital frames — engineered, fabricated and erected by one team.
PEB projects and structural steel projects delivered as one team
Five completed projects between 2022 and 2025 total 72,384 m² of built area and 4,189 MT of structural steel, all engineered, fabricated and erected by MAXXINFRA with no hand-offs between design and site: a four-span, 150 m long PEB complex at Konsari with 25 + 10 MT EOT cranes in every aisle and four roof monitors; three curved-roof raw-material storage buildings at Chandrapur totalling 48,157 m², including a 93.8 m clear span with fully open end walls; a 24.7 m clear-span helicopter hangar with a 5 MT crane, now in daily operation; an expandable 272 MT storage shed with a 10 MT crane; and a G+1 hospital steel frame with 786 m² of mezzanine floors.
Industrial steel building benchmarks from this work — 250 MT largest crane supported, 384 m longest building, 93.8 m maximum curved clear span, 54–161 kg/m² structural intensity — are the reference points we design to for warehouses, factory sheds, crane-duty workshops and institutional buildings across India. Walk through them in 3D project tours or request a quote.